Thursday, March 14, 2019

Bat Signal Open Lab 3/14

Today Tristan, Jorge, and I used the epoxy that Mr.Burnham mixed for us on the couplings of our prototype scissor lift. We swabbed the inside of each coupling with epoxy to ensure that PM could no longer destroy it. We then hammered the couplings into place and tested the lift by raising it up and down.

No comments:

Post a Comment