We had to prototype the new pipe that runs along the frame, the pieces are cut, however we need to find out a way to secure the bar as there are two pipes connected to a t bracket and under stress can break or pull the pipes out of the t bracket.
thus plan moving forward:
secure the axle that goes across the frame
attach to piston in a non permanent secure way
test the prototype
No comments:
Post a Comment