Wednesday, April 10, 2019

gamboa-am-jorge-2019-scissor lift

Today we re-planned the shaft that runs across the scissor lift, the first bar was flimsy and bent due to the applied pressure, thus no longer can serve our purpose, we prototype a t design to replace the bar, we used pvc in which we cut to 16in in length and attached it to the piston, we need to find a way to secure it on the piston for the diameter is not the same for the pvc coupling. We should have pictures for the next time as I would like to finish the prototype and test the lift.

No comments:

Post a Comment